How to Install Industrial Water Chiller?

1.Open the package to check if the machine is intact and all the necessary accessories are completed.



2.Open the injection port to feed cooling water. (Do not spill out the water!)



3.Connect the water inlet and outlet pipe well according to system conditions



4.Plug in power, turn on the power switch. (Do not start up without water in the water tank!)



5.Check the water level in the water tank.

The video about installation of chiller



Get in Touch

9850 6th St Rancho Cucamonga CA 91730

626-342-7605

service@sign-in-global.us

Newsletter

Subscribe to our special offers

Follow us

Follow us on Facebook Follow us on Youtobe
Back to top